RAHVA /Solutions·

Solutions built for real production needs

Each solution is built around a practical question on the factory floor: what needs to be seen, what data is collected, what is displayed to you, and how you can act on it.

01 / Choosing a solution

Where should you begin?

Three common starting points — any of them can be the beginning of your pilot.

START A

Start with machine status

If your main question is 'Which machines are currently running and which are stopped?', start with machine and downtime monitoring.

START B

Start by automating production counts

If manual production recording and data discrepancies are the main issue, start with production monitoring and KPIs.

START C

Start by building a unified view

If information is scattered across people and shifts, start with dashboards and reporting to centralize the data.

02 / Solutions

Multiple solutions, one shared data foundation

Machine monitoring

Problem: no one knows which machines are active at any given moment.

  • DataOperating status and machine activity signals
  • ViewReal-time status view for every connected machine
  • UseQuick response to downtime and full shop-floor awareness

Production monitoring

Problem: production data is recorded manually and is often inaccurate.

  • DataProduction counts, rates, targets, and activity
  • ViewLive counts and target attainment for each machine and shift
  • UseEliminate manual entry and make decisions based on up-to-date numbers

Production line monitoring

Problem: looking at machines individually doesn't provide a line-level picture.

  • DataStatus of multiple machines as one system
  • ViewUnified view of the entire line's performance at a glance
  • UseIdentify bottlenecks and improve line coordination

Downtime analysis

Problem: the duration and causes of downtime are unclear.

  • DataDowntime events, duration, and frequency
  • ViewDowntime timeline and most frequent causes
  • UsePrioritize actions to reduce downtime

Performance monitoring

Problem: machine and shift comparisons are made by guesswork.

  • DataMachine, line, and shift performance over time
  • ViewCompare periods and deviations from normal performance
  • UseDecisions based on actual comparisons, not guesses

Production KPIs

Problem: KPIs are either delayed or not calculated at all.

  • DataProduction rate, productivity, target attainment, cycle time
  • ViewUp-to-date KPI cards on the dashboard
  • UseA common numerical language for production meetings

Industrial dashboard

Problem: information is scattered across files and individual memory.

  • DataAll collected production data
  • ViewClear visual interfaces for each role
  • UseOne unified picture for the shop floor, office, and management

Historical production analysis

Problem: there is no historical record of production behavior.

  • DataComplete history of production, downtime, and KPIs
  • ViewTrends and recurring patterns over longer periods
  • UseRoot cause analysis and more accurate planning

Industrial reporting

Problem: generating production reports is time-consuming and delayed.

  • DataSummary of production performance for the selected period
  • ViewStructured, presentation-ready reports
  • UseDocumentation for meetings and audits

All solutions run on a common foundation

Solutions are not isolated islands — all of them draw from the same industrial data collected by sensors. Activating any solution today also contributes data that will feed future solutions.

  • Single data source for all solutions
  • Gradual activation, no need to restart
  • Independent sensor-based data collection, no changes to machine control
  • Scale from one machine to the entire factory

Not sure which solution is the right starting point?

In a brief conversation, we'll identify the best starting point for your equipment.

Speak with an industrial specialistExplore the platform